|
Location: Snoqualmie, WA
Size of Building: 4,068 sq ft
Number of Modules: 3
Features: This new classroom addition was built onto St. Joseph’s existing church. When completed, the new building provided a seamless look between the existing building and the new addition. Modular construction was chosen because the building would be produced in ½ the time of on-site construction and this would eliminate much of the typical noise and potential delays. An additional benefit was the fact the new addition could be completed prior to cutting through into the existing church.
Interior: The modular building was designed with 9’ T-grid ceilings, utilized painted sheetrock interior walls, 1/8” block tile flooring and featured stained wood interior doors and window trims.
Exterior: A site-built 5/12 pitch metal roof, large bay windows in all classrooms, board and batt painted wood siding, and attic mounted gas furnaces.
Energy efficient features included: insulation values of R19, R21 and R30, dual glazed windows, gas furnaces with programmable thermostats and automatic shut-offs for the office lights
.
For more information, click here.
 |
|
Feasibility Studies • Architectural Design • Project Management |
|